1.
Carlos Adrián CG, Coronel Sacoto DF. Application of the BIM management methodology in the water conduction channel of the Chiticay - Paute irrigation system. CCD [Internet]. 2021Jul.5 [cited 2026Jun.26];4(3):6-21. Available from: https://doi.org/10.33262/concienciadigital.v4i3.1761